- Business Analysis with duration of two months
- Design and architecture of the system with duration of two months
- System Development with duration of four months of these phase
- QA – 1 month
- Production Implementation – 2 months
- Training – 1 month
- Maintenance Support for 2 years
Vista Group as a main contractor for this project provided complete hardware and software solution. The software solution was based on EMC documenum platform. As well upon customer request additionally thru EMC Mydocumentum solution was integrated with the MS Sharpoint Server where all different forms were designed and developed.
The integration with the MS Sharpoint was chosen because of the friendly user interface and allows to the end user easy management control.
All processes were defined in the EMC documentum solution and EMC DB is used.
During Business Analysis phase were defined 116 different processes.